Hand & Toe Rail Design
Guard Railings for docks with walk-on ramps shall be located around the charging chamber opening. Guard railings and toe boards shall be provided on the sides of all walk-on ramps (in accordance with OSHA 1910.23).
<< previous
|
close window
|
next >>